Intersection Improvements
The Draft Environmental Impact Report analyzed 164 intersections within a 50 square-mile study area, one of the largest areas ever studied in Los Angeles. The Evolution Plan improves 139 intersections which includes signal upgrades, left turn signals, new signals and road improvements.
Improvements Map
When we invest in traffic improvements, the entire region benefits. The NBC Universal Evolution Plan is committed to helping find solutions and is the largest private investment in San Fernando Valley Transportation in over 25 years. Traffic improvements include:
Improving 139 intersections in the 50-square mile area surrounding Universal City including upgrades, street widenings and synchronizing signals
Working with Caltrans to:
improve speeds, safety and congestion on 5 miles of 101 Freeway
improve the 134 and 101 Freeway interchange
reconfigure the northbound on-ramp to the 101 Freeway at Highland
Assisting Caltrans to unlock more than $200 million in potential transportation funding to the Valley
Constructing an alternative to Barham Boulevard with a new North/South Road through our property
Adding Lanes to Lankershim Boulevard and Barham Boulevard; signal coordination, bike lanes and sidewalks for Forest Lawn Drive
Reducing new trips by connecting employees, visitors and new residents to the adjacent MTA transit station
Creating a new residential shuttle system to nearby studios and other employment hubs in Burbank, Hollywood and West Hollywood
  When we invest $100 million to improve traffic, we become a catalyst and the region benefits.
NBC Universal